 | Ukraine, Donetsk, ice arena «Leader» built on the standards of International Hockey Federation- Coast-to-coast building – from the ground works to the
complete start-up into exploitation - Building – metal frame covered with sandwich-panels.
- Size of the ice field is 30 õ 60 ì.
- Concrete based rink floor, system of heating of the ground to avoid freezing.
- Standard dasher board system made in Czech – double glass with counters
and protective netting. - Cooling aggregate (cooling performance 580 kW) with heat recuperation.
Recovered heat is used for needs of ice rink climate system. - Tribunes for 450 spectators
- Making-out of ice field for hockey playing
< /> |